Anbar Mall

Anbar Mall building project: under construction, which is located on a land area of 25,000 square meters, with a capital of $54 million – under construction.

Assumed by the local government in the stricken Ramadi after it was liberated. The aim was to stabilize the security and economic situation and rehabilitate this city for the purpose of stabilizing citizens, employing manpower and activating the movement of the local and regional market The location of Anbar Mall is on a plot of land with an area of up to (24,500) square meters on one of the most important main roads linking the Ramadi commercial and administrative center with the southern Road, which is the fastest commercial warehouse. Anbar Mall consists of five floors, an underground floor is a basement and four upper floors.

  1. The basement floor is built on almost the entire area of the land, with a limit of (23,500) square meters. Most of this area is designated for a car park that can accommodate up to 470 car parks, in addition to the presence of the middle area open to the other floors and connected to it by panorama elevators, escalators and a conveyor belt, in addition to the distribution of four other areas For the purpose of vertical connection with the upper floors, including an emergency staircase And two (2) elevators. The central area in the basement is surrounded by eight shops of different areas dedicated to banking and banking, in addition to the presence of other parts dedicated to maintenance. Services and storage
  2. The ground floor, which is higher than the level of the surrounding roads, about 160, divided into three main parts, the back part with an area of approximately (5000) square meters dedicated to car parking, it can accommodate up to 300 cars distributed over two floors, since the height of the car park is 3 meters, while the height of the ground floor is 6 meters And this position, It is linked to the external roads with two entrances and is linked to the other floors with intermediate movement throws to include the operating movement across the floors. Note that these parking lots are duplicated for the rest of the floors, and thus the capacity of the cars was 1200, in addition to the 470 provided from the basement. The flat part of the work on the ground floor contains the main hypermarket with an area of (3,500) square meters duplicated also on the first floor and linked together with a belt transporter .
    In addition to that, there are (50) shops available within this Central Zain with different spaces designated for various marketing activities, and it is hoped that these spaces will be filled with world-famous brands for all activities.
    As for the front part of the countries, overlooking the main side street, it was designated for open activities such as casinos and fast food, with a number of (8) zones served by two external health groups, in addition to correcting competitors and stray plants, to be a comfortable area for families to receive families to spend comfortable times there.
    Note that each of the four floors contains two health groups, in addition to the presence of two prayer areas on the third floor.
  3. The first floor, in addition to the presence of the second part of the hypermarket with an area of (3500) square meters and the presence of the rear car parks that were previously explained, there are 54 shops of various distances and various activities.
  4. The second floor also repeats the parking lot in the back. As for the front part, there are 55 shops with various spaces and activities with two showrooms, each of which is (1000) square meters.
  5. the third floor is the restaurant floor and the large gymnasium with an area of (4000) square meters, which includes all the children’s toys and entertainment from them.
  6. The mall contains cinema halls with an area of 1,000 square meters.
    In addition to the presence of (26) parts of different areas designated for restaurants and various quick walks and with famous international brands, with a large common middle area for the purpose of families sitting to spend happy times away from the noise of the city.
    In addition to all that, the designer paid attention to the services provided by providing an efficient electricity network and another for refrigeration and air conditioning, in addition to his great interest in the external facade of the building to be an architectural edifice worthy of this city with regard to high job opportunities, in addition to the fact that the construction of this mall relied on the consumption of large quantities of local construction materials And the employment of local manpower as well, which is estimated at about (250) workers per day. This contributed to revitalizing the economic aspect of the city, knowing that the operation of this mall in the future will contribute to the employment of (1,000) workers for the purpose of operating shops, restaurants, guards, service workers and maintenance workers.
    In addition, the mall contains cinema halls with an area of 1,000 square meters